SALAKIEW – DONGJONG ROAD FEASIBILITY PROJECT
Detailed Hydrological Studies for Construction of 6 lanes asphaltic concrete pavement (double surface treatment), a total length of 7,100 m from Ban Salakiew to Ban Dongjong in Lao PDR.
Detailed Hydrological Studies for Construction of 6 lanes asphaltic concrete pavement (double surface treatment), a total length of 7,100 m from Ban Salakiew to Ban Dongjong in Lao PDR.